
|
|

Construction includes cast-in-place concrete structure, aluminum window infill, and flat deck with a membrane roof.
 The 60,000 sf 3-story project had to be carried out while the existing building was occupied.

Special attention was given to integrating the new computer "clean room" into the on-going operations.
|
|